Â鶹´«Ã½

40 LEADENHALL

Contractor: Mace            Architect: Make

Value: £1.6m                        Engineer: WSP

 

• RC Upstand installation from B2 to Level 36
• RC Plinth Installation for Basement and Roof Â鶹´«Ã½
• In-situ RC Lintel and Down Stand Beam Installation
• RC Encasements to Existing Steel Columns and Beams
• RC Slab Infills to Existing Riser Openings
• Formation of Service Openings through RC and Metal Decking Slabs
• Formation of Service Openings through RC Core Walls
• Formation of Web Openings and Steel Strengthening Installation to Existing Steel Beams
• Plunge Column Removal between Ground Floor to B2