81 NEWGATE STREET

Contractor: Mace              Ìý´¡°ù³¦³ó¾±³Ù±ð³¦³Ù: KPF

³Õ²¹±ô³Ü±ð:Ìý£50m                        Engineer: AKT II

  • Full Strip Out of the existing BT Centre Building.
  • Removal of existing Roof Structure.
  • Structural Demolition to Blocks A, B, C , Ground floor & Basement.                         Including Design & Installation of all temporary propping & cross                           bracing.
  • Temporary Welfare Gantry
  • Tower crane bases
  • Construction of West Basement RC Box (including excavation works).
  • Construction of Cores 1, 2, 3 & 4, Twin wall & Insitu RC.
  • B2 to Ground Floor Construction to enable new steel frame to be                             constructed from GF.
  • 2 for 1 Column Replacement (including bridging steel between Blocks A&B)
  • Beam Strengthening & Column Jackets
  • NW Core steelwork infill from B2 to level 9
  • Drainage
  • Concrete Toppings to new steel frame & metal decking structure.
  • BMU plinths