CROSSRAIL – PLUMSTEAD MAINTENANCE FACILITY & URBAN REALM

Client: ATC
Value: £17³¾

• Neatly saw cutting of road / pavement surfacing.
• Trench excavation for the cable laying duct installation works was carried           out using a suitable excavator in combination with hand excavation.
• Pit Chambers – Installation of chambers for the cable duct entries consisted      of in-situ R.C. construction and modular pre-cast units.
• All drainage from a level of 500mm below the completed finished level,               including pipes and chambers.
• Manholes from above biscuit level, surface drains including ACO channels, fin     drains.
• Bases to lighting columns and lighting protection barricades, including the         sleeves required for installation of columns.
• Reinforced concrete foundations and cast in bolts for the bicycle shed /                motorcycle parking facility.
• Modular gravel retaining system, Baffles to Car Park
• Access roads from formation to surface level, Road Humps
• Tactile Paving, Kerbs, Footpaths, Edging Stones
• White lining to roads, entrances, carparks, and signage
• Bollards and barriers; including foundations, Bicycle shed / Motorcycle                 parking facility.