MOD Site – West London

Client: Costain
Value: £9³¾

 

  • External Works Fence Easement Clearance
  • Undertake the earthworks to the internal elements of the facility                           boundary from current levels to final design levels. Importing and laying of         topsoil across site.
  • Undertake the construction of permanent bund of spoil material from the           project.
  • Demolition / demobilisation of temporary site set up, removal of                             temporary warehouse, Removal of concrete laydown areas, Removal of                road sweeper waste chambers,
  • Supply and installation of surface water drainage to system completion.
  • Installation of Swale 5 and the connections to the pipework as detailed in           the drawings, Completion of swales along the western edge of the main                process facility, North Pond remodelling and 4no. headwalls, Install of                  drainage along road tie in near Southern Gatehouse,
  • Supply and installation of all hard standings, Kerbs, and edgings to                         completion, Grasscrete hard-standings, Footways and associated paved              areas, Final surface course to the facility road network
  • Full depth construction of new roads and tie ins outside facility boundary
  • Line painting and signage and Geogrid.
  • Landscape planting and seeding.
  • Supply and installation of Lighting Columns, Distribution Pillars,                              installation of 5no. dry riser pits.
  • Installation of North Gatehouse RC Retaining Wall.