Â鶹´«Ã½

MILLENIUM BRIDGE HOUSE

Contractor: ISG           Architect: Piercy & Company

³Õ²¹±ô³Ü±ð:Ìý£18³¾Â                        Engineer: HTS

  • Reconfiguration of facades to all elevations
  • Temporary works and propping
  • Scaffolding package
  • Cladding removal 9000m2
  • Demolition of 5500m3 of reinforced concrete
  • MOLA attendance
  • Basement reconfiguration adjacent the Thames
  • Pile caps
  • 330 tonnes of structural steel
  • 6,000 m3 of new structrual concrete connected to the existing structure