Â鶹´«Ã½

ROSALIND FRANKLIN INSTITUTE, HARWELL,

Contractor: Mace               Architect: IBI Group (UK) Limited

³Õ²¹±ô³Ü±ð:Ìý£4³¾Â                          Engineer: Price and Myers

  • Site setup and enabling works
  • Piling works
  • Excavation
  • Pile Mats
  • Drainage
  • Ground Floor Slab & RC Frame